Sign In | Join Free | My tjskl.org.cn
China TORICH INTERNATIONAL LIMITED logo
TORICH INTERNATIONAL LIMITED
TORICH INTERNATIONAL LIMITED The Steel Tube Maker
Verified Supplier

11 Years

Home > Heat Exchanger Tubes >

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

TORICH INTERNATIONAL LIMITED
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

  • 1
  • 2
  • 3

Brand Name : TORICH

Model Number : ASTM A178

Certification : ISO 9001 ISO 14001 TS 16949 EN 10204.3.1

Place of Origin : China

MOQ : 2 Ton

Price : USD1500-1550

Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram

Supply Ability : 60000 Ton

Delivery Time : 35-40 Days

Packaging Details : In hexagonal bundles with woven bags

Product name : Super Heater ERW SA178 Grade A Grade C Carbon Boiler Steel Tube

Keyword : ERW Boiler Steel Tube

Type : Welded Steel Tube

Surface : Oiled

Material : Grade A, Grade C, Grade D

Usage : Boiler, heat exchanger

Shape : Round

Length : 4-12m

OD : 12.7-127mm

WT : 0.9-9mm

Contact Now

Super Heater ERW SA178 Grade A Grade C Carbon Boiler Steel Tube

1. Details:

Standard SA178
OD 12.7-127mm
WT 0.9-9mm
Length 4-12m, or according to customer required
Fixed length or random length
Material Grade A, Grade C, Grade D, all belongs to carbon tube
Production method ERW (Electric Resistance Welded)
Heat treatment Annealed, normalized, stress relieved
Key words ERW steel tube, steel pipes carbon, welded steel tube, boiler steel tubes,

Surface Quality:The internal and external surfaces of the steel tube are not allowed to have cracks, scabs, folds, delaminations, laps, and burns. Allows for scribes, scratches, misalignment of welds, burns, oxide scales, and external burr removal traces that are not more than a negative wall thickness deviation

Inspection items:

chemical composition

Tensile test

Ultrasonic examination

Eddy current flaw detection

Bending test

Flattening test

Heat treatment: After welding, all tubes shall be heat treated at a temperature of 900℃ or higher and followed by cooling in air or in the cooling chamber of a controlled- atmoshpere furnace. Cold-drawn tubes shall be heat treated after the final cold -draw pass at a temperature of 650℃ or higher.

Product marking: The manufacturer's name or symbol may be placed permanently on each tube by rolling or light stamping before normalizing. If a single stamp is placed on the tube by hand, this mark should be not less than 8 in[200mm] from one end of the tube.

2. Showing:

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C CarbonSuper Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

RFQ:

What is your Guarantee?
1.SO9001:2008 and TS16949 certificate SGS, BV, TUV or other third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.

Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation

Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc


How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!

Any more questions about your doubts, please feel free to send us your emails or call!



















Product Tags:

ERW Boiler Steel Tube

      

SA178 Grade A Boiler Steel Tube

      

SA178 Grade C Boiler Steel Pipe

      
Quality Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon for sale

Super Heater ERW Boiler Steel Tube SA178 Grade A Grade C Carbon Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: TORICH INTERNATIONAL LIMITED
*Subject:
*Message:
Characters Remaining: (0/3000)